top of page

Archer River Bridge Replacement

Year:

Archer River, QLD

2021

Project Owner:

QLD Department of Transport and Main Roads

Services:

Bid Management, Cost Engineering

The Archer River Bridge Replacement project involved constructing a new 230-meter-long bridge over the Archer River to replace the existing crossing prone to flooding. The new bridge, featuring 11 spans of 21 meters each, is designed to reduce annual closure times from flooding, thereby improving year-round accessibility for Cape York communities. The project also included associated roadworks to integrate the bridge with the existing road network.

Archer River Bridge Replacement

Get in touch to discuss how we can help

© 2024 E&DCo

+61 420 216 030

76 Brunswick Street Fortitude Valley, QLD 4006

  • LinkedIn
  • Facebook
  • Instagram
bottom of page