top of page

Channel Island Battery Energy Storage System (BESS)

Year:

Darwin, NT

2022

Project Owner:

NT Department of Infrastructure, Logistics and Planning

Services:

Cost Engineering

The Channel Island Battery Energy Storage System (BESS), also known as the Darwin-Katherine Battery Energy Storage System, is a 35 MW/35 MWh facility located at the Channel Island Power Station near Darwin, Northern Territory. Developed by Territory Generation, this project aims to enhance grid stability and support the integration of renewable energy sources into the Darwin-Katherine electricity network. The BESS utilizes advanced Virtual Synchronous Machine technology to provide virtual inertia and system strength services, reducing reliance on gas-fired generation and contributing to the Northern Territory's renewable energy targets.

Channel Island Battery Energy Storage System (BESS)

Get in touch to discuss how we can help

© 2024 E&DCo

+61 420 216 030

76 Brunswick Street Fortitude Valley, QLD 4006

  • LinkedIn
  • Facebook
  • Instagram
bottom of page