top of page
Deodar Drive Trunk Stormwater Infrastructure
Year:
Burleigh Heads, QLD
2021
Project Owner:
City of Gold Coast
Services:
Bid Management, Cost Engineering
The Deodar Drive Trunk Stormwater Infrastructure project involves upgrading the existing underground drainage network around Deodar Drive in Burleigh Waters. The works include replacing existing stormwater pipes with larger ones along Deodar Drive and constructing a 1200mm stormwater pipe between Symonds Road and Comet Court. These upgrades aim to improve flood resilience for properties and roads in the catchment area, enhancing the overall stormwater capacity to support future developments, including the Gold Coast Light Rail.
bottom of page